# Visual Inspection & NDT by Rope Access

> Close visual inspection and NDT (ultrasonic thickness, weld testing) on structures, tanks, towers, and chimneys by rope access — no scaffolding, audit-ready data.

URL: https://ropeaccesscenter.id/en/ndt-inspection-services/

Close visual inspection and non-destructive testing (NDT) of structures, tanks, towers, and chimneys — reaching inspection points without scaffolding, with audit-ready records.

## Why rope access for inspection

Inspection often needs only a short time at each point, but the points are spread out at height. Scaffolding for that costs time and money out of proportion to the job. A rope access team reaches point after point in a working day and hands over data the same or next day.

## Who does the testing

Visual inspection is carried out by rope access technicians trained to read structural condition. For NDT methods such as ultrasonic thickness (UT), magnetic particle (MPI), or penetrant testing (PT), testing is done by personnel qualified in that method, with the rope access technicians providing access and safety.

## Data you can use

Every finding is logged with location, photos, and measurements, so the report supports maintenance decisions, audits, and comparison with the next inspection.

## What we deliver

### Scope of work

- Close visual inspection of steel and concrete structures
- Ultrasonic thickness (UT) on tanks, pipes, and chimneys
- Weld inspection by MPI or PT by qualified personnel
- Corrosion and crack mapping
- Façade and building element inspection
- Photo and video records per point

### Assets & sectors

- Storage tanks and vessels
- Chimneys and flare stacks
- Towers and steel structures
- Bridges and jetties
- Building façades and structures

### What you receive

- An inspection report with photos per finding
- Measurement data in an auditable format
- Prioritised recommendations
- An indexed photo and video archive

## Four steps from survey to report

### 1. Survey & quotation

We review the site or your photos and drawings, then send the scope, method, schedule, and a written quotation.

### 2. Work plan & permits

A risk assessment, method statement, and rescue plan are prepared before work starts; permits are arranged with the site manager.

### 3. Delivery

A team of Kemnaker-certified technicians works with a supervisor on site; the area below the work zone is secured.

### 4. Report & handover

Before-and-after photos and a work report are handed over with recommendations for the next maintenance cycle.

## Frequently asked questions

### Can the inspection results be used for audits?

Yes. The report lists location, method, photos, and measurements for every point, so it is traceable and comparable with the next inspection.

### How long does an inspection take?

It depends on the number of points and the height. Rigging a rope access system usually takes only a few hours, so most of the time goes into the inspection itself.

### Is a shutdown needed?

Visual inspection and most NDT can be done while the asset is operating, provided the permit to work and safety conditions are met.

## Tell us about the job

Send the location, the type of building or asset, and your target dates. We reply with a written quotation, usually the same working day.

---

**Rope Access Center** (RAC) — Rope Access Training, Certification & Corporate Services · part of the Inland group (https://inland.co.id)

- Address: Jl. Kelor II No 31, Pd. Cabe Ilir, Pamulang, Tangerang Selatan, Banten 15418, Indonesia
- WhatsApp/Phone: +62 856 770 0883
- Email: info@inland.co.id
- Service area: Indonesia
- Hours: Mon–Fri 08:00–17:00, Sat 08:00–13:00 (WIB)
